
EDGELEC 100pcs 5mm Pink Lights LED Diodes Clear Round Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode
by EDGELEC
Sale
Original price
$12.99
Original price
$12.99
-
Original price
$12.99
Original price
$12.99
Current price
$8.99
$8.99
-
$8.99
Current price
$8.99
Brand: EDGELEC
Color: [12] Pink / 100pcs
Features:
- Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
- Product Features: Pink - 5mm Round Clear Lens
- Product Parameters: 29mm Long Lead / DC 3.0V-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
- Product Parameters: Luminance Brighter Up To +20% / 30° Viewing Angle / Single LED Diodes Wight: 0.29g
- Accessories: 100pcs 430ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / ±1% Tolerance
Binding: Tools & Home Improvement
Details: * Low Energy Consumption And Low Heat. * Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. * Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F * Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F * Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. * Get other LED models? Please search "EDGELEC Diodes".
Package Dimensions: 6.6 x 4.0 x 0.6 inches